Russian   English   Deutsch   Italiano
 
Sustainable
Designing
®  


Compromise
Compromise
Tel./fax: +7 (925) 517-85-11
+7 (903) 741-67-81
7710032[dog]tollroads.ru
 
 
 

Established in April 2005, COMPROMISE GROUP (CG) is a commercial enterprise, specializing in structural and bridges engineering. Our company was formed by four professional engineers who have been in design and inspection business for over 30 years (combined experience).

CG’s technical staff currently consists of sixteen experienced engineers and nine professional CAD drafters.

Main services provided:

  • New Buildings and Renovation Designs:
    • Multifamily Housing;
    • Single-Family Residential;
    • Storages;
    • Undeground Parking;
    • Airplane Hangers;
    • Riding Arenas;
    • Industrial Facilities;
    • Health Care Facilities;
    • Commercial/Retail Facilities;
    • etc.
  • Bridge (incl. railroad), footbridges and Highway Designs and Rehabilitation;
  • Wooden Bridge design;
  • Tunnel Design;
  • Steel Design;
  • All types of Foundations and Basis design;
  • Lightweight Structures Design;
  • pre/post-tensioning;
  • Geomechanics;
  • Foundations Pits Designs;
  • Cranes and lifting tools Designs;
  • Building Inspections;
  • Supervision;
  • Wind tunnel test;
  • Creating of numerical models of any structures;
  • Author's supervision;

We are specializing in designing following structures:

  • Concrete (reinforce, stressed);
  • Steel;
  • Steel/Concrete Composite;
  • Timber;
  • Masonry;
  • Aluminum;

Design Software:

  • AutoCAD and Microstation for drafting and modeling;
  • SCAD Offise for calculations of concrete structures;
  • NASTRAN for calculations and FEA analysis;
  • LIRA for calculations of concrete structures;
  • Wall-3 for analysis and calculations foundations pits;
  • etc.

Our desire as a firm is to produce clear, well documented construction drawings with a realistic approach to design and detailing. All of our work is geared toward design solutions that are developed with constructability and budget considerations in mind.

Best regards,
Vice-president
GeorgeG. Vinogradov

 

 
   
     
News
 
22.04.2008 Test site start